Official RFPClosed
Renewable Energy
250 MW / 1000 MWh Standalone Battery Energy Storage System (BESS) Projects
Updated international Request for Proposals for standalone Battery Energy Storage System projects on a Build, Own and Operate basis.
Total capacity250 MW / 1000 MWh
Individual project10 MW / 40 MWh
Operational period15 years (BOO basis)
Grid connection33 kV
Specified grid substations
Key RFP requirements
Project land within a maximum 5 km of the designated Grid Substation. The BOI/NSO addendum also includes revised grid-interconnection requirements, BESS simulation/model requirements, revised contractual documents, proposal-security validity, and limits each project proponent to a maximum of two technical proposals.
Source notice: This page is a summary for investor discovery. Sri Lanka Investors is an independent platform and is not the issuing authority. Investors must use the latest official BOI / National System Operator tender documents, addenda, dates and instructions when preparing a proposal.