Official & institutional opportunities

Public investment opportunities and time-sensitive RFPs.

We highlight selected opportunities published by recognised Sri Lankan institutions and always link investors back to the original issuing authority for the controlling tender documents.

Sri Lanka BESS RFP 2026 poster
Official RFPClosed
Renewable Energy

250 MW / 1000 MWh Standalone Battery Energy Storage System (BESS) Projects

Updated international Request for Proposals for standalone Battery Energy Storage System projects on a Build, Own and Operate basis.

Total capacity250 MW / 1000 MWh
Individual project10 MW / 40 MWh
Operational period15 years (BOO basis)
Grid connection33 kV

Specified grid substations

AmbalangodaAmparaBolawattaChunnakamGalleHambantotaHoranaKillinochchiKiribathkumburaKosgamaKurunegalaMadampeMahiyanganayaMathugamaMonaragalaPanaduraPannalaPannipitiya

Key RFP requirements

Project land within a maximum 5 km of the designated Grid Substation. The BOI/NSO addendum also includes revised grid-interconnection requirements, BESS simulation/model requirements, revised contractual documents, proposal-security validity, and limits each project proponent to a maximum of two technical proposals.

Source notice: This page is a summary for investor discovery. Sri Lanka Investors is an independent platform and is not the issuing authority. Investors must use the latest official BOI / National System Operator tender documents, addenda, dates and instructions when preparing a proposal.